Step.1
Find the up right corner.
How to install your court?
Place all tiles in the same direction.
Step.2
Step.3
Place the male lock over
the female lock.
Step.4
Spell the tiles with plastic hammer or feet.
NO 1: We has marked numbers 1, 2, 3,…16 on the cartons. Please open the cartons one by one.
NO 2: Opening the numbered 1 carton,please install the tiles 1-1 to 1-16 as the left picture drawing direction.
NO 3: After 1-16, please install the 2-1beside the 1-1, and then install rest flooring as per same method, i.e. 3-1 and then 4-1and so on.
Installation Instruction
ZSFloor Installation Instruction for full court.ppt
9.65MBDownload
Leave Message
Name
*
Phone
*
Email
*
Country
*
Court  Type and Size
Message
Verification code
 Change Image
*
Submit
Amy Yang

Email: info@zsfloor.cn

Phone: +86 18380432424

WhatsApp:+86 18380432424
Service
Contact Us
Follow Us
Information
Join Us Today